Specifications
|
Air-Bloc® All Weather STPE™ Fluid Applied Vapor Permeable Air Barrier Guide Specification |
 |
|
|
|
|
Architectural Details
|
ABSTPE-1A Wall Foundation Slab Below Grade |
 |
|
 |
|
ABSTPE-1B Wall Foundation Slab on Grade |
 |
|
 |
|
ABSTPE-1C Wall Foundation Transition No Brick Ledge |
 |
|
 |
|
ABSTPE-2A Pipe Penetration 0.5 Inch Wide Gap Max |
 |
|
 |
|
ABSTPE-2B Pipe Penetration 0.75 Inch Wide Gap Max |
 |
|
 |
|
ABSTPE-3A-1 Inside and Outside Corners |
 |
|
 |
|
ABSTPE-3A-2 Inside and Outside Corners |
 |
|
 |
|
ABSTPE-3B Inside and Outside Corners |
 |
|
 |
|
ABSTPE-3C Typical Soffit |
 |
|
 |
|
ABSTPE-4A Substrate Transition |
 |
|
 |
|
ABSTPE-4B Substrate Transition |
 |
|
 |
|
ABSTPE-4C Substrate Transition |
 |
|
 |
|
ABSTPE-5A Thru-Wall Flashing |
 |
|
 |
|
ABSTPE-6-A1 Non-Flanged Window Section |
 |
|
 |
|
ABSTPE-6-A2 Non-Flanged Window Sequence Installation |
 |
|
 |
|
ABSTPE-6A-A Flanged Window Section Method A |
 |
|
 |
|
ABSTPE-6A-C Flanged Window Sequence Installation Method A |
 |
|
 |
|
ABSTPE-6C Door Frame Section |
 |
|
 |
|
ABSTPE-6A1-A Flanged Window Section Method A1 |
 |
|
 |
|
ABSTPE-6A1-C Flanged Window Window Sequence Installation Method A1 |
 |
|
 |
|
ABSTPE-6B-A Non-Flanged Window Section Method B |
 |
|
 |
|
ABSTPE-6B-C Non-Flanged Window Sequence Installation Method B |
 |
|
 |
|
ABSTPE-6B1-A Non-Flanged Window Section Method B1 |
 |
|
 |
|
ABSTPE-6B1-C Non-Flanged Window Sequence Installation Method B1 |
 |
|
 |
|
ABSTPE-7A1 Reverse Lap |
 |
|
 |
|
ABSTPE-7A2 Reverse Lap |
 |
|
 |
|
ABSTPE-8A Construction Joints 0.5 Inch Gap Max |
 |
|
 |
|
ABSTPE-8B1 Construction Joints 1 Inch Gap Max |
 |
|
 |
|
ABSTPE-8C1 Construction Joints 2 Inch Gap Max |
 |
|
 |
|
ABSTPE-8DA Deflection Joint |
 |
|
 |
|
ABSTPE-8E Cracks 0.5 Inch Gap Max |
 |
|
 |
|
ABSTPE-9A Roofing Wrapping Parapet |
 |
|
 |
|
ABSTPE-9B Air Barrier Transition at Parapet |
 |
|
 |
|
ABSTPE-TID1A Air-Bloc All Weather STPE transition with 790-11 |
 |
|
 |
|
ABSTPE-TID1B Air-Bloc All Weather STPE transition with 790-11 |
 |
|
 |
|
ABSTPE-TID1C Air-Bloc All Weather STPE transition with 790-11 |
 |
|
 |
|
ABSTPE-TID2A Air-Bloc All Weather STPE transition with CM100 |
 |
|
 |
|
ABSTPE-TID2B Air-Bloc All Weather STPE transition with CM100 |
 |
|
 |
|
ABSTPE-TID3A Air-Bloc All Weather STPE transition with Pumadeq System |
 |
|
 |
|
ABSTPE-TID4A Air-Bloc All Weather STPE transition with single ply roofing |
 |
|
 |
|
ABSTPE-TID4B Air-Bloc All Weather STPE transition with single ply roofing |
 |
|
 |
|
ABSTPE-TID5A Air-Bloc All Weather STPE transition with Blueskin WP200 |
 |
|
 |
|